Electrical engineer
Electrician
Service engineer
+7(921) 594-21-79
Vadim Kondratyev
Candidate ID 249871
March 13, 1981
Married / son – born in 2008 у
English – upper-Intermediate
ready to move from Russia
electrician Mysite portfolio
13 years of experience on the large industrial facilities
dawnlaod
resume
dawnlaod
DIPLOMA
EDUCATION:
Мaster's degree
1998-2004
Major: Transport systems and transport machines.
Saint - Petersburg State Railway University / www.pgups.ru/en
WORK EXPERIENCE:
Since 08.2019 to present: ISS Global www.issworld.com
Maintaining of engineering equipment.
Maintenance Engineer:
I am responsible for maintaining facilities at British American Tobacco factory site.
I organize Planned Preventive Maintenance (PPM) and one -time tasks.
My job responsibilities include:
Managing of our service team on site.
Managing of our contractor’s works on site.
Issues provided by service team:
The maintenance of indoor electric lightning system, electrical distribution boards.
The maintenance of a video surveillance system- Honeywell EBI
The maintenance of fire alarm system, smoke exhaust system -ESMI, D+H
The maintenance of access control and security alarm systems- Honeywell EBI
The maintenance of industrial doors and gates-Forssan, Finnlock
Issues provided by contractors:
The maintenance of lifting equipment
The maintenance of warehouse dock equipment Roltex, Crawford, Loading Systems
The maintenance of overhead sectional doors – Roltex, Crawford
The maintenance of high-performance roll-up doors- Albany, Fenmer
Uninterruptible Power System equipment- EATON, Liebert Hiross
Cooling equipment- Carrier, Aircool
For organizing my work activities, I have developed a work schedule. I organized electronic reporting for
our client. My colleagues fill (tick) work progress according their tasks every day. I examine my team’s
work status, seeing daily bar-chart.
For helping our team members, we use clouds services. We store (keep) electronic versions of user
manuals, checklists there. So, this information is available to use all-time.
I appoint and monitor contractor’s SLA’s and contractor’s KPI’s.
I am responsible for compliance environmental, health and safety policies of all our work activities. I
organize checking of electrical appliances and tools, testing of ladders, testing of safety harnesses, etс.
Since 07.2017 to 08.2019: Stroigemini Company www.stroigemini.ru
Construction and assembly company.
Projects manager:
Preparation of commercial proposals (analyze technical specifications, development of solutions, calculation of labor expenditures, selection of materials and equipment, risk assessment).
I negotiate commercial deals with the customers. I review and negotiate contracts, made work schedules and made The Project of Manufacture of Works, develop a Working documentation, carry out ordering of equipment and materials, organize mechanical installation works and commissioning works, interact with contractors. I exercise control over the implementation deadlines, quality of works and safety.
I product as-built documentations and services instruction reports (The ACT of Hand over and acceptance.) I participate in production meetings with customers (including foreign), contractors, and any others organizations.
My customers are Jacobs coffee factory, Philip Morris tobacco company.
Since 07.2009 to 07.2017: Hyper Technology Company, HTec www.hyptec.ru
Number of employees-140 people.
Design, installation, commissioning, maintenance of engineering systems (ventilation, compressed air, video surveillance systems, access control, fire safety, local area network, power supply. Mechanical and electrical installation of industrial equipment (conveyor lines, palletizer machines, warehouse racking, painting shops).
The number of employees in the company is 140 people.
Position- Deputy commercial Director:
Promotion of company's services, participation in tenders, conclusion of contracts, interaction with Customers and contractors, budget control, workflow optimization, consolidation of calculations on different sections of the heads of departments in commercial proposals, validation of commercial proposals, monitoring of deadlines for submission of commercial proposals, recording and archiving of commercial proposals, etc. participated in the development and updating of the tool the calculation of commercial proposals.
I was an official representative of the company and the single point of contact for purchasing departments at the facilities of the large plants. I had access to the electronic trading venues of these objects.
I know the specifics of the organization of work in foreign enterprises, including requirements for labor
protection.
I have experience in organization of service maintenance of engineering systems (ventilation, fire suppression systems, HVAC, conveyors, roller beds).
Position- Project manager:
Preparation of commercial proposals (analyze technical specifications, development of solutions,
calculation of labor expenditures, selection of materials and equipment, risk assessment).
I negotiated commercial deals with the customer. I reviewed and negotiated contracts, made work
schedules and made The Project of Manufacture of Works , developed a Working documentation,
carried out ordering of equipment and materials, organized installation works and commissioning works,
interacted with contractors. I exercised control over the implementation deadlines, quality of works and
safety. I produced as-built documentations and services instruction reports (The ACT of Hand over and
acceptance.
I participated in production meetings with customers (including foreign), contractors, and any others
organizations.
I was responsible for the safe.
I have certificates: fire safety, labor protection, working the cradle, the operator lifts, electrical
permission (1000V).
I handed over the work to the customer and technical supervision (eg. AECOM, PAC).
I managed a team of up to 40 people.
I implemented projects up to 300 thousand of EURO.
My participation in projects (installation of engineering systems), eg.:
Automobile plant:
- Warehouse complex;
- Administrative building;
- Wastewater treatment plant;
- Compressor;
- Warehouse of finished products;
- New paint shop.
Food processing plant:
- building of roads and warehouses;
- Administrative building.
Position- Service engineer:
Main responsibilities: Service working control on General Motors Saint- Petersburg:
• service of engineer equipment, HVAC, Automation and Control Systems
• assembling of new equipment
• direction of new projects
I managed most of installations on GM Saint-Petersburg while extensions.
Since 2005 to 2009: PF Dukon Company,
RT-Conveyer Company,
Promindustry Company,
Proletarskiy Avongard Company
mechanical engineer: Design, sale and installation of conveyors and industrial equipment.
SKILLS:
Professional user: AutoCAD, EPLAN Electric, MS Office (Word, Excel, PowerPoint, Teams, Outlook) Maximo, Scouter
(CRM System for British American Tobacco), CorelDraw.
Responsible, Executive, Active, Sosiable
Do not smoke. I have no other bad habits.
Hobbies: Traveling, CorelDraw (Draw+Photo-Paint)
I like do with my son Lego Mindstorms, Skate, Cycling, Drawing.
